Research | Baycrest

Authorization Failed

You are not allowed to perform this operation. Click here to go back to the previous page.

Other - Planned Electrical Shut Down by Physical Plant

03/05/09 12:15AM - 4:30AM
Other - Planned Electrical Shut Down by Physical Plant

The only interruptions as a result of this are as follows:

Hospital & Apotex:

  • Only mag locks will be effected & will release during the shut down.
  • Additional Security coverage will be on site to monitor perimeter exits.

Brain Health Complex:

  • Lights will be on Emergency Power and therefore be limited in this building.
  • Mag locks will be affected
  • Exterior lights will be off in the parking area directly in front of Brain Health Complex. You should not park in that area if you will be accessing this parking lot during that period of time.

Posluns Building:

  • Lights will be on Emergency Power and therefore be limited in this building.
  • Mag locks will be affected
  • One elevator in each bank of elevators will be operating.

Staff are reminded to shut down computers and other sensitive equipment prior to the shut down. 

Announcements will be made prior to the shut down to notify staff who may not receive this notice.

If you should have any questions regarding this power interruption please call Robert at ext. 2701 or Neil at ext. 2384.